Storm prep tidal surge 1-sided tie up mitigation
Moderator: KenKrawford
-
- Posts: 62
- Joined: Sat Nov 22, 2008 6:44 pm
Storm prep tidal surge 1-sided tie up mitigation
That's a mouthfull for sure but as a canal-dwelling C350 in hurricane country this merits consideration by those in a similar situation. I bit the bullet and this is my dock. 2 attachment points requiring no spring lines, fenders, and most importantly, no manual adjusting during times of high and low water. My 350 has survived multiple hurricanes but it has done $$ in dock damage, 12 inch pilings with one dolphined to a second one.
- Attachments
-
- red line ratchet strapped to cleat, Blue line to support weight of slider..
- 4.jpg (96.56 KiB) Viewed 675 times
-
- 3.jpg (109.33 KiB) Viewed 675 times
-
- 2.jpg (130.85 KiB) Viewed 675 times
-
- No longer necessary
- 1.jpg (195.45 KiB) Viewed 675 times